Lesson 11 – O: Orient Your Learning: How Do We Test and Improve a Solar Energy System?
O: Orient Your Learning
Prepare to Gather Trustworthy Evidence
What Makes a Performance Test Useful?
Engineers use performance tests to learn how a system behaves under stated conditions. A useful test is more than turning something on and watching what happens. It begins with a focused question and a plan for gathering evidence.
A strong performance-test plan includes:
- A specific question
- A prediction based on what is already known
- The condition or variable being examined
- Conditions that should remain the same when possible
- Evidence to collect
- A clear boundary on what actions are approved and safe
From Vague to Testable Questions
|
Less Useful Question |
More Useful Question |
|---|---|
|
Does the solar system work? |
How does the system respond when one identified service is used during a documented sunlight condition? |
|
Is the battery good? |
How does the recorded system condition compare before and after an approved observation period? |
|
Can the system power a building? |
What evidence would be needed to determine whether the system could support a particular set of services for a stated time? |
The more useful questions do not promise an answer before the evidence is collected. They describe a condition that can be observed and documented.
Variables and Controlled Conditions
A system’s performance can change when conditions change. Engineers identify variables so they can make clearer comparisons.
|
Possible Condition |
Why It Matters |
|---|---|
|
Available sunlight |
Solar panels may produce different amounts of electrical energy under different light conditions. |
|
Service or load being used |
Different devices and services can require different amounts of electrical energy. |
|
Starting system condition |
A system beginning at one condition may respond differently than a system beginning at another. |
|
Time of use |
A short observation does not provide the same evidence as a longer period of use. |
|
Operating choices |
Scheduling or prioritizing services can change how available energy is used. |
A controlled condition is something a team tries to keep consistent when possible. For example, if a team wants to compare two services, it may document the same observation time and starting condition so the comparison is more meaningful.
Think About It
Why would it be difficult to compare two results if a team did not record what changed, what stayed the same, or when the observation occurred?
